2018 BMW M3 — VIN WBS8M9C52J5K98454

Auction History VIN WBS8M9C52J5K98454

Sign in to see the price Show Price

Example Report

Specifications

VIN WBS8M9C52J5K98454
Auction Information
Auction Iaai
Lot number 37389925
Date of sale Nov 28, 2023
Location
Seller Progressive Casualty Insurance
Documents ORIGINAL-TX
Condition
Primary Damage Rear
Secondary Damage
Odometer 33545.1 miles (Actual)
Key Key Available
Start code Run & Drive
Value
Estimated Retail Value
Estimated Repair Cost
Technical Specifications
Engine 3.0L I6 FI DOHC 24V NF4
Fuel Type Gasoline
Cylinders 6
Transmission Unknown
Drive Rear Wheel Drive
Body color Orange
Body Style Sedan
Series