VIN
WBS8M9C58J5K99740
Auction Information
Auction
Iaai
Lot number
37981669
Date of sale
Dec 15, 2023
Location
Seller
Hanover Insurance
Documents
SALVAGE-PA
Condition
Primary Damage
Right Side
Secondary Damage
Odometer
16246.48 miles (Actual)
Key
Key Available
Start code
Run & Drive
Value
Estimated Retail Value
Estimated Repair Cost
Technical Specifications
Engine
3L I-6 DI, DOHC, VVT, turbo 425HP
Fuel Type
Gasoline
Cylinders
6
Transmission
Manual
Drive
Rear Wheel Drive
Body color
Black
Body Style
Sedan
Series