2017 BMW M3 — VIN WBS8M9C38H5G85182

Auction History VIN WBS8M9C38H5G85182

Example Report

Specifications

VIN WBS8M9C38H5G85182
Technical Specifications
Engine 3.0L Turbocharged
Fuel Type
Cylinders 6
Transmission A/T
Drive Rear Wheel Drive
Body color Gray
Body Style
Series Sedan
Condition Notes
Announcements
MCOMP,EXEC,DAP+,LIGHT,MDC,NAV,
High Value Options
Back-Up Camera Blind Spot Monitor Bluetooth Connection Climate Control Hard Disk Drive Media Storage Heads-Up Display Heated Front Seat(s) Heated Rear Seat(s) Heated Steering Wheel HID headlights Integrated Turn Signal Mirrors Keyless Start Lane Departure Warning Multi-Zone A/C Navigation System Power Driver Seat Power Passenger Seat Premium Sound System Rain Sensing Wipers Rear A/C Rear Parking Aid Satellite Radio Seat Memory Tire Pressure Monitor
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Bucket Seats CD Player Child Safety Locks Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Driver Vanity Mirror Front Head Air Bag Front Side Air Bag HD Radio Headlights-Auto-Leveling Heated Mirrors Keyless Entry Knee Air Bag Leather Steering Wheel Mirror Memory Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Passenger Vanity Mirror Power Door Locks Power Folding Mirrors Power Mirror(s) Power Steering Power Windows Rear Defrost Rear Head Air Bag Rear Spoiler Security System Steering Wheel Audio Controls Traction Control Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
Power Door Locks w/Autolock Feature Garage Door Transmitter 10-Way Power Passenger Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt And Manual Cushion Extension Cloth/Leather Upholstery Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats Power 1st Row Windows w/Front And Rear 1-Touch Up/Down Trip Computer Cruise Control w/Steering Wheel Controls Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer Bmw Online Full Service Internet Access Fob Controls -inc: Trunk/Hatch/Tailgate, Windows And Sunroof/Convertible Roof Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button Perimeter Alarm Memory Settings -inc: Driver Seat And Door Mirrors Manual Tilt/Telescoping Steering Column Sport Leather Steering Wheel Rear HVAC w/Separate Controls Power Rear Windows Proximity Key For Doors And Push Button Start 10-Way Power Driver Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt And Manual Cushion Extension Heated Front Sport Seats -inc: Lumbar Support Smart Device Integration 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat Day-Night Auto-Dimming Rearview Mirror Integrated Navigation System w/Voice Activation Dual Zone Front Automatic Air Conditioning Engine Immobilizer
Mechanical
Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo w/ZCP-inc: 444 HP With High Precision Direct Injection Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control Electric Power-Assist Speed-Sensing Steering Transmission: 6-Speed Manual Rear-Wheel Drive Electro-Mechanical Limited Slip Differential
Keys
Smart - 1
M Competition Package - 7MN
20" M LT/ALU Wheel Star-SPK666 Bmw IND Shadow Line Ext Cont Adaptive M Suspension Competition Package SHADOWLINE Exterior Trim
Driving Assistance Plus - ZDB
Active Driving Assistant Speed Limit Info Active Blind Spot Detection Side And Top View Cameras
Executive Package - ZEC
Wireless Charging Rear View Camera Head-UP Display Heated Steering Wheel Retractable Headlight Washers Park Distance Control
Lighting Package - ZLP
Adaptive Full Led Lights Automatic High Beams
Exterior
Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding And Turn Signal Indicator Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets Fixed Rear Window w/Defroster Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off Lip Spoiler Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M Tailgate/Rear Door Lock Included w/Power Door Locks
Entertainment
Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory Bluetooth Wireless Phone Connectivity harman/kardon Surround Sound System Satellite Radio w/1 Year Subscription Radio: AM/FM Audio System
Safety/Security
Rear Child Safety Locks ABS And Driveline Traction Control Curtain 1st And 2nd Row Airbags Dual Stage Driver And Passenger Front Airbags Dual Stage Driver And Passenger Seat-Mounted Side Airbags Airbag Occupancy Sensor Electronic Stability Control (Esc) Bmw Assist eCall Emergency S.O.S Tire Specific Low Tire Pressure Warning Driver And Passenger Knee Airbag
Other
Auto-Dimming Mirrors Auto-Dimming REARVIEW Mirror Power Front Seats Adjustable Seat Width Storage Package Heated Front Seats Heated Rear Seats Adjustable Front Armrest Carbon Fiber Trim With Blk CHR Retractable Headlight Washers Park Distance Control Rain Sensor And Auto Headlight Automatic Climate Control CO2 Relevant Vehicles C02 Content 20" M LT/ALU Wheel Star-SPK666 Heated Steering Wheel M Double-Clutch Transmission Tire Pressure Monitor Adaptive M Suspension Alarm System Universal Garage-Door Opener Comfort Access Keyless Entry Rear View Camera Floor Mats Dynamic Cruise Control Adaptive Full Led Lights Ambient Lighting Additional 12-V Power Sockets Automatic High Beams Active Blind Spot Detection Decoding For NO-Dazzle HGH BM Active Driving Assistant Side And Top View Cameras Emergency Trunk Release Navigation System Head-UP Display Radio Control US SIRIUSXM Radio w/ 1 Year SUB. HARMAN KARDON Surround Sound DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Wireless Charging WIFI HOTSPOT SHADOWLINE Exterior Trim Anthracite HEADLINER Bmw IND Shadow Line Ext Cont Competition Package Hot Climate Version Acoustic Belt Warning Language Version English Oil CHG 10,000 MLS/12 Months Refrigerant Variable Light Decoding Speed Limit Info Daytime Driving Lights Shipping Package Characteristic Control Model Year Code Transport Protection Merino Leather Dashboard Connected App Compatibility Competition Package Enhanced USB & BLUETOOTH NO Sunshades Tier 2