VIN
WBS8M9C3XH5G85376
Technical Specifications
Engine
3.0L Turbocharged
Fuel Type
Cylinders
6
Transmission
A/T
Drive
Rear Wheel Drive
Body color
ALPINE WHITE
Body Style
Series
Sedan
Condition Notes
Announcements
DAP+,MCOMP,EXEC,MDC,PSDP,NAV,
High Value Options
Back-Up Camera
Blind Spot Monitor
Bluetooth Connection
Climate Control
Hard Disk Drive Media Storage
Heads-Up Display
Heated Front Seat(s)
Heated Rear Seat(s)
Heated Steering Wheel
HID headlights
Integrated Turn Signal Mirrors
Keyless Start
Multi-Zone A/C
Navigation System
Power Driver Seat
Power Passenger Seat
Premium Sound System
Rain Sensing Wipers
Rear A/C
Rear Parking Aid
Satellite Radio
Seat Memory
Tire Pressure Monitor
Options
A/C
Adjustable Steering Wheel
AM/FM Stereo
Auto-Dimming Rearview Mirror
Automatic Headlights
Bucket Seats
CD Player
Child Safety Locks
Cruise Control
Daytime Running Lights
Driver Adjustable Lumbar
Driver Air Bag
Driver Illuminated Vanity Mirror
Driver Vanity Mirror
Front Head Air Bag
Front Side Air Bag
HD Radio
Headlights-Auto-Leveling
Heated Mirrors
Keyless Entry
Knee Air Bag
Leather Steering Wheel
Mirror Memory
Passenger Adjustable Lumbar
Passenger Air Bag
Passenger Air Bag Sensor
Passenger Illuminated Visor Mirror
Passenger Vanity Mirror
Power Door Locks
Power Folding Mirrors
Power Mirror(s)
Power Steering
Power Windows
Rear Defrost
Rear Head Air Bag
Rear Spoiler
Security System
Steering Wheel Audio Controls
Traction Control
Trip Computer
Universal Garage Door Opener
Variable Speed Intermittent Wipers
Interior
Power Door Locks w/Autolock Feature
Garage Door Transmitter
10-Way Power Passenger Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt And Manual Cushion Extension
Cloth/Leather Upholstery
Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
Trip Computer
Cruise Control w/Steering Wheel Controls
Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer
Bmw Online Full Service Internet Access
Fob Controls -inc: Trunk/Hatch/Tailgate, Windows And Sunroof/Convertible Roof
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button
Perimeter Alarm
Memory Settings -inc: Driver Seat And Door Mirrors
Manual Tilt/Telescoping Steering Column
Sport Leather Steering Wheel
Rear HVAC w/Separate Controls
Power Rear Windows
Proximity Key For Doors And Push Button Start
10-Way Power Driver Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt And Manual Cushion Extension
Heated Front Sport Seats -inc: Lumbar Support
Smart Device Integration
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Day-Night Auto-Dimming Rearview Mirror
Integrated Navigation System w/Voice Activation
Dual Zone Front Automatic Air Conditioning
Engine Immobilizer
Mechanical
Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo w/ZCP-inc: 444 HP With High Precision Direct Injection
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control
Electric Power-Assist Speed-Sensing Steering
Transmission: 6-Speed Manual
Rear-Wheel Drive
Electro-Mechanical Limited Slip Differential
Keys
Smart - 2
M Competition Package - 7MN
Competition Package
20" M LT/ALU Wheel Star-SPK666
Adaptive M Suspension
SHADOWLINE Exterior Trim
Bmw IND Shadow Line Ext Cont
Driving Assistance Plus - ZDB
Speed Limit Info
Side And Top View Cameras
Active Driving Assistant
Active Blind Spot Detection
Executive Package - ZEC
Rear View Camera
Heated Steering Wheel
Park Distance Control
Wireless Charging
Head-UP Display
Retractable Headlight Washers
Lighting Package - ZLP
Adaptive Full Led Lights
Automatic High Beams
Exterior
Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding And Turn Signal Indicator
Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance
Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Fixed Rear Window w/Defroster
Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
Lip Spoiler
Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M
Tailgate/Rear Door Lock Included w/Power Door Locks
Entertainment
Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory
Bluetooth Wireless Phone Connectivity
harman/kardon Surround Sound System
Satellite Radio w/1 Year Subscription
Radio: AM/FM Audio System
Safety/Security
Rear Child Safety Locks
ABS And Driveline Traction Control
Curtain 1st And 2nd Row Airbags
Dual Stage Driver And Passenger Front Airbags
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Airbag Occupancy Sensor
Electronic Stability Control (Esc)
Bmw Assist eCall Emergency S.O.S
Tire Specific Low Tire Pressure Warning
Driver And Passenger Knee Airbag
Other
CO2 Relevant Vehicles
C02 Content
20" M LT/ALU Wheel Star-SPK666
Heated Steering Wheel
M Double-Clutch Transmission
Tire Pressure Monitor
Adaptive M Suspension
Alarm System
Universal Garage-Door Opener
Comfort Access Keyless Entry
Rear View Camera
Floor Mats
Auto-Dimming Mirrors
Auto-Dimming REARVIEW Mirror
Power Front Seats
Adjustable Seat Width
Storage Package
Heated Front Seats
Heated Rear Seats
Adjustable Front Armrest
Carbon Fiber Trim With Blk CHR
Retractable Headlight Washers
Park Distance Control
Rain Sensor And Auto Headlight
Automatic Climate Control
Dynamic Cruise Control
Adaptive Full Led Lights
Ambient Lighting
Additional 12-V Power Sockets
Automatic High Beams
Active Blind Spot Detection
Decoding For NO-Dazzle HGH BM
Active Driving Assistant
Side And Top View Cameras
Emergency Trunk Release
Navigation System
Head-UP Display
Radio Control US
SIRIUSXM Radio w/ 1 Year SUB.
HARMAN KARDON Surround Sound
DVD Area Coding, North America
Bmw Assist ECALL
Bmw TELESERVICES
Bmw Online And Bmw APPS
Advanced RTTI
Remote Services
Apple CARPLAY Compatibility
Wireless Charging
WIFI HOTSPOT
SHADOWLINE Exterior Trim
Anthracite HEADLINER
Bmw IND Shadow Line Ext Cont
Competition Package
Hot Climate Version
Acoustic Belt Warning
Language Version English
Oil CHG 10,000 MLS/12 Months
Refrigerant
Variable Light Decoding
Speed Limit Info
Daytime Driving Lights
Shipping Package
Characteristic Control
Model Year Code
Transport Protection
Carbon Fiber Mirror Caps
Carbon Fiber Rear Spoiler
Connected App Compatibility
Competition Package
Enhanced USB & BLUETOOTH
Led Door Projector
NO Sunshades
Tier 2