VIN
WBS8M9C39H5G85899
Technical Specifications
Engine
3.0L Turbocharged
Fuel Type
Cylinders
6
Transmission
A/T
Drive
Rear Wheel Drive
Body color
BLACK SAPPHIRE METALLIC
Body Style
Series
Sedan
Condition Notes
Announcements
20" WHEELS/MSRP $79/NEW!/COMPETITION PKG $4,700/EXECUTIVE
PKG/REAR VIEW CAMERA/PDC/HEAD UP DISPLAY/COMFORT
ACCESS/HARMAN KARDON SOUND
M COMPETITION PKG/NAV
High Value Options
Back-Up Camera
Bluetooth Connection
Climate Control
Hard Disk Drive Media Storage
Heads-Up Display
Heated Front Seat(s)
Heated Rear Seat(s)
Heated Steering Wheel
HID headlights
Integrated Turn Signal Mirrors
Keyless Start
Multi-Zone A/C
Navigation System
Power Driver Seat
Power Passenger Seat
Premium Sound System
Rain Sensing Wipers
Rear A/C
Rear Parking Aid
Satellite Radio
Seat Memory
Smart Device Integration
Tire Pressure Monitor
Options
A/C
Adjustable Steering Wheel
AM/FM Stereo
Auto-Dimming Rearview Mirror
Automatic Headlights
Auxiliary Audio Input
Brake Assist
Bucket Seats
Carbon Fiber Interior Trim
CD Player
Child Safety Locks
Cruise Control
Daytime Running Lights
Driver Adjustable Lumbar
Driver Air Bag
Driver Illuminated Vanity Mirror
Driver Vanity Mirror
Engine Immobilizer
Floor Mats
Front Head Air Bag
Front Side Air Bag
HD Radio
Headlights-Auto-Leveling
Heated Mirrors
Intermittent Wipers
Keyless Entry
Knee Air Bag
Leather Steering Wheel
Mirror Memory
MP3 Player
Pass-Through Rear Seat
Passenger Adjustable Lumbar
Passenger Air Bag
Passenger Air Bag Sensor
Passenger Illuminated Visor Mirror
Passenger Vanity Mirror
Power Door Locks
Power Folding Mirrors
Power Mirror(s)
Power Steering
Power Windows
Rear Bench Seat
Rear Defrost
Rear Head Air Bag
Rear Spoiler
Security System
Stability Control
Steering Wheel Audio Controls
Telematics
Traction Control
Transmission w/Dual Shift Mode
Trip Computer
Universal Garage Door Opener
Variable Speed Intermittent Wipers
Interior
Power Door Locks w/Autolock Feature
Day-Night Auto-Dimming Rearview Mirror
Garage Door Transmitter
10-Way Power Passenger Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt And Manual Cushion Extension
Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
Cloth/Leather Upholstery
Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru
Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Trip Computer
Cruise Control w/Steering Wheel Controls
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer
Proximity Key For Doors And Push Button Start
Fob Controls -inc: Trunk/Hatch/Tailgate, Windows And Sunroof/Convertible Roof
Power Rear Windows
Manual Tilt/Telescoping Steering Column
Perimeter Alarm
Memory Settings -inc: Driver Seat And Door Mirrors
Rear HVAC w/Separate Controls
10-Way Power Driver Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt And Manual Cushion Extension
Heated Front Sport Seats -inc: Lumbar Support
Sport Leather Steering Wheel
Smart Device Integration
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Bmw Online Full Service Internet Access
Integrated Navigation System w/Voice Activation
Dual Zone Front Automatic Air Conditioning
Engine Immobilizer
Mechanical
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo w/ZCP-inc: 444 HP With High Precision Direct Injection
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control
Electric Power-Assist Speed-Sensing Steering
Rear-Wheel Drive
Transmission: 6-Speed Manual
Electro-Mechanical Limited Slip Differential
Keys
Smart - 2
M Competition Package - 7MN
SHADOWLINE Exterior Trim
Bmw IND Shadow Line Ext Cont
Competition Package
20" M LT/ALU Wheel Star-SPK666
Adaptive M Suspension
Executive Package - ZEC
Park Distance Control
Heated Steering Wheel
Head-UP Display
Retractable Headlight Washers
Rear View Camera
Wireless Charging
Exterior
Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding And Turn Signal Indicator
Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M
Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance
Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Fixed Rear Window w/Defroster
Tailgate/Rear Door Lock Included w/Power Door Locks
Lip Spoiler
Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
Entertainment
Satellite Radio w/1 Year Subscription
Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory
Radio: AM/FM Audio System
harman/kardon Surround Sound System
Bluetooth Wireless Phone Connectivity
Safety/Security
Rear Child Safety Locks
ABS And Driveline Traction Control
Curtain 1st And 2nd Row Airbags
Dual Stage Driver And Passenger Front Airbags
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Airbag Occupancy Sensor
Electronic Stability Control (Esc)
Bmw Assist eCall Emergency S.O.S
Tire Specific Low Tire Pressure Warning
Driver And Passenger Knee Airbag
Other
CO2 Relevant Vehicles
C02 Content
20" M LT/ALU Wheel Star-SPK666
Heated Steering Wheel
M Double-Clutch Transmission
Tire Pressure Monitor
Adaptive M Suspension
Alarm System
Universal Garage-Door Opener
Comfort Access Keyless Entry
Rear View Camera
Moonroof
Floor Mats
Auto-Dimming Mirrors
Auto-Dimming REARVIEW Mirror
Heated Rear Seats
Adjustable Front Armrest
Carbon Fiber Trim With Blk CHR
Retractable Headlight Washers
Park Distance Control
Rain Sensor And Auto Headlight
Xenon Headlights
Adaptive Light Control
Automatic Climate Control
Dynamic Cruise Control
Ambient Lighting
Additional 12-V Power Sockets
Emergency Trunk Release
Navigation System
Head-UP Display
Radio Control US
SIRIUSXM Radio w/ 1 Year SUB.
HARMAN KARDON Surround Sound
DVD Area Coding, North America
Bmw Assist ECALL
Bmw TELESERVICES
Bmw Online And Bmw APPS
Advanced RTTI
Remote Services
Wireless Charging
WIFI HOTSPOT
SHADOWLINE Exterior Trim
Anthracite HEADLINER
Bmw IND Shadow Line Ext Cont
Competition Package
Hot Climate Version
Acoustic Belt Warning
Language Version English
Oil CHG 10,000 MLS/12 Months
Refrigerant
Variable Light Decoding
Daytime Driving Lights
Shipping Package
Characteristic Control
Model Year Code
Transport Protection
Carbon Fiber Mirror Caps
Carbon Fiber Rear Spoiler
Connected App Compatibility
Competition Package
Enhanced USB & BLUETOOTH
NO Sunshades
Tier 2
Power Front Seats
Adjustable Seat Width
Storage Package
Heated Front Seats