2016 BMW M3 — VIN WBS8M9C54GP966865

Auction History VIN WBS8M9C54GP966865

Example Report

Specifications

VIN WBS8M9C54GP966865
Technical Specifications
Engine
Fuel Type
Cylinders 6
Transmission 6-Speed M/T
Drive Rear Wheel Drive
Body color Gray
Body Style
Series 4dr Sdn
Condition Notes
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Brake Assist Bucket Seats CD Player Child Safety Locks Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Engine Immobilizer Floor Mats Front Side Air Bag HD Radio Heated Mirrors Intermittent Wipers Keyless Entry Knee Air Bag Leather Steering Wheel Mirror Memory MP3 Player Pass-Through Rear Seat Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Power Door Locks Power Folding Mirrors Power Mirror(s) Power Steering Power Windows Rear Bench Seat Rear Defrost Rear Floor Mats Rear Head Air Bag Rear Spoiler Remote Engine Start Security System Stability Control Steering Wheel Audio Controls Telematics Traction Control Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats Cruise Control w/Steering Wheel Controls Power Door Locks w/Autolock Feature Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru Garage Door Transmitter Perimeter Alarm Manual Tilt/Telescoping Steering Column Rear HVAC w/Separate Controls Engine Immobilizer Sport Leather Steering Wheel Bmw Online Full Service Internet Access Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Memory Settings -inc: Driver Seat And Door Mirrors Proximity Key For Doors And Push Button Start Includes Power Side Bolster Support And Manual Thigh Support Power Rear Windows Power 1st Row Windows w/Front And Rear 1-Touch Up/Down Day-Night Auto-Dimming Rearview Mirror Trip Computer Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button Integrated Navigation System w/Voice Activation Heated Front Sport Seats -inc: Lumbar Support Dual Zone Front Automatic Air Conditioning 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Mechanical
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo Rear-Wheel Drive Transmission: 6-Speed Manual Electro-Mechanical Limited Slip Differential Electric Power-Assist Speed-Sensing Steering
Keys
Smart - 1
Exterior
Body-Colored Power Heated Auto Dimming Side Mirrors w/Manual Folding And Turn Signal Indicator Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M Fixed Rear Window w/Defroster Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off Lip Spoiler Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets Tailgate/Rear Door Lock Included w/Power Door Locks
Entertainment
Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory Bluetooth Wireless Phone Connectivity Satellite Radio w/1 Year Subscription 16 Harman/Kardon Speakers Radio: AM/FM Audio System
Safety/Security
Bmw Assist eCall Emergency S.O.S Airbag Occupancy Sensor Driver And Passenger Knee Airbag Dual Stage Driver And Passenger Seat-Mounted Side Airbags Electronic Stability Control (Esc) ABS And Driveline Traction Control Dual Stage Driver And Passenger Front Airbags Rear Child Safety Locks Tire Specific Low Tire Pressure Warning Curtain 1st And 2nd Row Airbags
Other
CO2 Relevant Vehicles C02 Content 18" Wheel 513 M Mixed Tires Tire Pressure Monitor Alarm System Universal Garage-Door Opener Comfort Access Keyless Entry Gray Band Windshield Power Rear Sunshade Rear Manual Side Window Shades Floor Mats Auto-Dimming Mirrors Auto-Dimming REARVIEW Mirror Power Front Seats Lumbar Support Adjustable Seat Width/Lumbar Storage Package Heated Front Seats Adjustable Front Armrest Carbon Fiber Trim With Blk CHR Rain Sensor And Auto Headlight Xenon Headlights Adaptive Light Control Automatic Climate Control Dynamic Cruise Control Ambient Lighting Additional 12-V Power Sockets Emergency Trunk Release Navigation System Radio Control US Satellite Radio w/1 Year SUB. HARMAN KARDON Surround Sound DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Hands-Free BLUETOOTH And USB SHADOWLINE Exterior Trim Anthracite HEADLINER Hot Climate Version Acoustic Belt Warning Language Version English Oil CHG 10,000 MLS/12 Months Variable Light Decoding Daytime Driving Lights Shipping Package Characteristic Control Model Year Code Transport Protection Manual Transmission Tier 2