2016 BMW M3 — VIN WBS8M9C50G5E68872

Auction History VIN WBS8M9C50G5E68872

Example Report

Specifications

VIN WBS8M9C50G5E68872
Technical Specifications
Engine 3.0L Turbocharged
Fuel Type
Cylinders 6
Transmission 6-Speed M/T
Drive Rear Wheel Drive
Body color SAKHIR ORANGE METALLIC
Body Style
Series 4dr Sdn
Condition Notes
Announcements
COMP PK,LIGHT PK NO BKS/K1
High Value Options
Bluetooth Connection Climate Control Hard Disk Drive Media Storage Heated Front Seat(s) Heated Rear Seat(s) HID headlights Integrated Turn Signal Mirrors Keyless Start Multi-Zone A/C Navigation System Power Driver Seat Power Passenger Seat Premium Sound System Rain Sensing Wipers Satellite Radio Seat Memory Tire Pressure Monitor
Options
A/C Adjustable Steering Wheel AM/FM Stereo Auto-Dimming Rearview Mirror Automatic Headlights Auxiliary Audio Input Brake Assist Bucket Seats Carbon Fiber Interior Trim CD Player Child Safety Locks Cruise Control Daytime Running Lights Driver Adjustable Lumbar Driver Air Bag Driver Illuminated Vanity Mirror Driver Vanity Mirror Engine Immobilizer Floor Mats Front Head Air Bag Front Side Air Bag HD Radio Headlights-Auto-Leveling Heated Mirrors Intermittent Wipers Keyless Entry Knee Air Bag Leather Steering Wheel Mirror Memory MP3 Player Pass-Through Rear Seat Passenger Adjustable Lumbar Passenger Air Bag Passenger Air Bag Sensor Passenger Illuminated Visor Mirror Passenger Vanity Mirror Power Door Locks Power Folding Mirrors Power Mirror(s) Power Steering Power Windows Rear Bench Seat Rear Defrost Rear Floor Mats Rear Head Air Bag Rear Spoiler Security System Stability Control Steering Wheel Audio Controls Telematics Tire Inflator Traction Control Trip Computer Universal Garage Door Opener Variable Speed Intermittent Wipers
Interior
Day-Night Auto-Dimming Rearview Mirror Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats Integrated Navigation System w/Voice Activation Power Door Locks w/Autolock Feature Includes Power Side Bolster Support And Manual Thigh Support Power Rear Windows 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat Bmw Online Full Service Internet Access Garage Door Transmitter Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination Sliding Front Center Armrest And Rear Center Armrest w/Pass-Thru Engine Immobilizer Cruise Control w/Steering Wheel Controls Manual Tilt/Telescoping Steering Column Sport Leather Steering Wheel Rear HVAC w/Separate Controls Trip Computer Dual Zone Front Automatic Air Conditioning Memory Settings -inc: Driver Seat And Door Mirrors Power 1st Row Windows w/Front And Rear 1-Touch Up/Down Perimeter Alarm Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry And Panic Button Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer And Trip Computer Proximity Key For Doors And Push Button Start Heated Front Sport Seats -inc: Lumbar Support
Mechanical
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist And Hill Hold Control Transmission: 6-Speed Manual Electric Power-Assist Speed-Sensing Steering Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo Electro-Mechanical Limited Slip Differential Rear-Wheel Drive
Keys
Master - 2
M Competition Package - 7MN
Adaptive M Suspension Competition Package Bmw IND Shadow Line Ext Cont 20" M LT/ALU Wheel Star-SPK666 SHADOWLINE Exterior Trim
Lighting Package - ZLP
Automatic High Beams Adaptive Full Led Lights
Exterior
Lip Spoiler Fixed Rear Window w/Defroster Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light Alloy V-spoke, Style 513M Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed Performance Tailgate/Rear Door Lock Included w/Power Door Locks Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off Body-Colored Power Heated Auto Dimming Side Mirrors w/Manual Folding And Turn Signal Indicator
Entertainment
16 Harman/Kardon Speakers Radio: AM/FM Audio System Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control And 20 Gb Internal Memory Bluetooth Wireless Phone Connectivity Satellite Radio w/1 Year Subscription
Safety/Security
Rear Child Safety Locks Curtain 1st And 2nd Row Airbags Driver And Passenger Knee Airbag ABS And Driveline Traction Control Dual Stage Driver And Passenger Front Airbags Bmw Assist eCall Emergency S.O.S Airbag Occupancy Sensor Electronic Stability Control (Esc) Tire Specific Low Tire Pressure Warning Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Other
CO2 Relevant Vehicles C02 Content 20" M LT/ALU Wheel Star-SPK666 Tire Pressure Monitor Adaptive M Suspension Alarm System Universal Garage-Door Opener Comfort Access Keyless Entry Gray Band Windshield Floor Mats Auto-Dimming Mirrors Auto-Dimming REARVIEW Mirror Power Front Seats Adjustable Seat Width/Lumbar Storage Package Heated Front Seats Heated Rear Seats Adjustable Front Armrest Carbon Fiber Trim With Blk CHR Rain Sensor And Auto Headlight Automatic Climate Control Dynamic Cruise Control Adaptive Full Led Lights Ambient Lighting Additional 12-V Power Sockets Automatic High Beams Decoding For NO-Dazzle HGH BM Emergency Trunk Release Navigation System Radio Control US Satellite Radio w/1 Year SUB. HARMAN KARDON Surround Sound DVD Area Coding, North America Bmw Assist ECALL Bmw TELESERVICES Bmw Online And Bmw APPS Advanced RTTI Remote Services Enhanced B/T And SMARTPHONE IN SHADOWLINE Exterior Trim Anthracite HEADLINER Bmw IND Shadow Line Ext Cont Competition Package Hot Climate Version Acoustic Belt Warning Language Version English Oil CHG 10,000 MLS/12 Months Variable Light Decoding Daytime Driving Lights Shipping Package Characteristic Control Model Year Code Transport Protection Active Comfort Seats Competition Package Manual Transmission NO Sunshades Tier 2