2023 BMW M3 — VIN WBS53AY04PFP17492

Auction History VIN WBS53AY04PFP17492

Sign in to see the price Show Price

Example Report

Specifications

VIN WBS53AY04PFP17492
Auction Information
Auction Iaai
Lot number 38721641
Date of sale Feb 26, 2024
Location
Seller State Farm Group Insurance
Documents SALVAGE CERTIFICATE-CA
Condition
Primary Damage Front End
Secondary Damage UNKNOWN
Odometer 5108.8 miles (Actual)
Key Key Available
Start code Run & Drive
Value
Estimated Retail Value
Estimated Repair Cost
Technical Specifications
Engine 3.0L I-6 DI, DOHC, VVT, turbo, 473HP
Fuel Type Gasoline
Cylinders 6
Transmission Manual
Drive Rear Wheel Drive
Body color Green
Body Style Sedan
Series SEDAN